NFC South East Project

Published On: May 20, 2013

The Company is constructing a new 220/11kV substation for the power needs of NFC Africa Mining Plc (NFCA), with respect to their new mining and metallurgical plants.

NFCA’s new underground mine is located at the former Mukulumpe Farms along the Kitwe-Chingola Road and the power infrastructure required has an anticipated load increase of 45MW from this new mining load.

Share this article

Follow us

about CEC

Copperbelt Energy Corporation Plc (CEC) is a Zambian power generation, transmission, distribution, and supply company

Recent CEC news